• Tekmar Subsea at Offshore Europe 2011 in Aberdeen

    Tekmar Subsea will be exhibiting at the Offshore Europe 2011 Exhibition in Aberdeen.

    Read news

  • Tekmar Subsea Record Breaking Growth

    Tekmar Subsea enjoyed a record-breaking year in 2010 increasing turnover by nearly 270%.

    Read news

  • Launch and Recovery Systems

    Tekmar Subsea Hold Launch and Recovery Systems in Stock for Rapid Delivery and Installation.

    Read news

  • Technip Norge Multi Purpose Handling System

    Tekmar Subsea Deliver State of the Art Multi Purpose Handling System to Technip Norge.

    Read news

  • Tekmar Supply Pipeline Repair Equipment for Pluto Project

    Tekmar Subsea Ltd complete a prestigious contract for Woodside Australia.

    Read news

  • Tekmar Subsea in Darlington UK

    Tekmar Subsea Relocation to Purpose Built Facility in Darlington UK.

    Read news

  • Tekmar Subsea is 25 Years Young!

    Tekmar Subsea is proud to celebrate 25 years in the Oil & Gas industry.

    Read news

  • New Contract Awards for Tekmar Subsea

    New contract awards are underpinning the continued growth within Tekmar Subsea.

    Read news

  • Range of Pipeline Repair Equipment completed

    Tekmar Subsea have cemented their position as market leaders in the field of pipeline repair equipment.

    Read news

  • Technip Norge AS

    Tekmar Subsea awarded multi-million pound contract by Technip Norge AS.

    Read news

  • Sapesco Libya

    Tekmar Subsea awarded pipeline repair clamp contract by Sapesco Libya.

    Read news

  • Acergy LARS

    Tekmar Subsea awarded Acergy contract to modify existing LARS.

    Read news

  • Tekmar Subsea new website

    Tekmar Subsea launch new website, designed with the marine engineer in mind.

    Read news

  • Tekmar Group open new head office

    Tekmar Group have opened a new head office and invested to increase its manufacturing capability to meet high customer demand.

    Read news

  • BS-EN-ISO 9001:2008 certification

    Tekmar Group Management Systems recertified to BS-EN-ISO 9001:2008 by Det Norske Veritas

    Read news

  • Tekmar Subsea invest in Autodesk Inventor

    Tekmar Subsea have successfully installed Autodesk Inventor into their design suite.

    Read news

  • ROV performed pipeline repair clamp of the coast of Egypt

    Tekmar Subsea seal hole in oil pipe wall, saving 3,000 barrels of oil per day

    Read news

  • Flare Stack Reinforcement in Egypt

    Flare Stack Reinforcement from Design to Installation in 21 Days

    Read news

Tekmar Subsea - News and Events

Flare Stack Reinforcement from Design to Installation in 21 Days
26th November 2009

 

The purpose of the project was to unrgently reinforce the annular cavity in three subsea flare stacks before the stacks became unstable.

 

Tekmar Subsea were commissioned  to design and manufacture all equipment on a 21 day schedule. Our service engineers then successfully installed the equipment of the coast of Egypt.

 

This was the first ROV performed flare stack reinforcement project completed in the region.

 

The ROV was initially fitted with 1-off clamp and the subsea drilling machine. After latching onto the flare stack subsea a 2" diameter hole was remotely drilled. The ROV disengaged from the clamp leaving the system on the pipe and returned to surface for another clamp. This procedure was repeated until three clamps were installed and holes drilled on each each flare stack.

 

The subsea drilling machine was then removed from the ROV interface shelf and the grouting stabs fitted. This allowed the ROV to reattach to the installed clamps. Grout was then pumped into the annular cavity from the topside spread.  Following completion of the grouting operation an isolation was activated and the ROV recovered.

 

Client benefits provided by solution

Long term reinforcement of severly corroded flare stacks

ROV remote installation.

 

Project Responsibilities

• SAPESCO Installation Contractor
• TEKMAR SUBSEA Equipment Supplier