• Tekmar Subsea at Offshore Europe 2011 in Aberdeen

    Tekmar Subsea will be exhibiting at the Offshore Europe 2011 Exhibition in Aberdeen.

    Read news

  • Tekmar Subsea Record Breaking Growth

    Tekmar Subsea enjoyed a record-breaking year in 2010 increasing turnover by nearly 270%.

    Read news

  • Launch and Recovery Systems

    Tekmar Subsea Hold Launch and Recovery Systems in Stock for Rapid Delivery and Installation.

    Read news

  • Technip Norge Multi Purpose Handling System

    Tekmar Subsea Deliver State of the Art Multi Purpose Handling System to Technip Norge.

    Read news

  • Tekmar Supply Pipeline Repair Equipment for Pluto Project

    Tekmar Subsea Ltd complete a prestigious contract for Woodside Australia.

    Read news

  • Tekmar Subsea in Darlington UK

    Tekmar Subsea Relocation to Purpose Built Facility in Darlington UK.

    Read news

  • Tekmar Subsea is 25 Years Young!

    Tekmar Subsea is proud to celebrate 25 years in the Oil & Gas industry.

    Read news

  • New Contract Awards for Tekmar Subsea

    New contract awards are underpinning the continued growth within Tekmar Subsea.

    Read news

  • Range of Pipeline Repair Equipment completed

    Tekmar Subsea have cemented their position as market leaders in the field of pipeline repair equipment.

    Read news

  • Technip Norge AS

    Tekmar Subsea awarded multi-million pound contract by Technip Norge AS.

    Read news

  • Sapesco Libya

    Tekmar Subsea awarded pipeline repair clamp contract by Sapesco Libya.

    Read news

  • Acergy LARS

    Tekmar Subsea awarded Acergy contract to modify existing LARS.

    Read news

  • Tekmar Subsea new website

    Tekmar Subsea launch new website, designed with the marine engineer in mind.

    Read news

  • Tekmar Group open new head office

    Tekmar Group have opened a new head office and invested to increase its manufacturing capability to meet high customer demand.

    Read news

  • BS-EN-ISO 9001:2008 certification

    Tekmar Group Management Systems recertified to BS-EN-ISO 9001:2008 by Det Norske Veritas

    Read news

  • Tekmar Subsea invest in Autodesk Inventor

    Tekmar Subsea have successfully installed Autodesk Inventor into their design suite.

    Read news

  • ROV performed pipeline repair clamp of the coast of Egypt

    Tekmar Subsea seal hole in oil pipe wall, saving 3,000 barrels of oil per day

    Read news

  • Flare Stack Reinforcement in Egypt

    Flare Stack Reinforcement from Design to Installation in 21 Days

    Read news

Moon Pool Systems

Tekmar have produced five Multi Purpose Handling Systems (MPHS) for use with a wide variety of sub-sea tools.

 

The MPHS sits over the moon-pool of the vessel and lowers tools sub-sea on a main-lift winch. The system can also be fitted with two or four guide wire winches.

 

Three lift beams are fitted to the top of the tower, two for the guide wire winches and one for the main lift winch. The beams are multi position and are moved hydraulically.

 

A complete skidding system is supplied which is seafastened to the vessel deck and provide the storage and rail system to transport the tools into the MPHS. Storage slots are modular therefore additional sections can be added. The tools are moved using a hydraulic push / pull unit.

 

The base of the tower incorporates three platforms. The central moonpool door lowers down into the moonpool and is fitted with a failsafe latching system that interfaces with the skidrails to prevent this door from accidentally opening.

 

Two side panel doors are provided for maintenance personnel and operate on independent hydraulic circuits.

 

A telescopic cursor frame is mechanically lowered into the moonpool and requires no permanent welding to the vessel. A winch controlled cursor carriage is fitted with adjustable prongs to suit a range of sub-sea tools.

 

As standard safety harness rails are fitted around the inside of the tower. The inside of the tower is fully lit by spotlights and the upper walkway is fitted with four striplights.

 

The MPHS is designed, constructed and tested according to Det Norsk Veritas Standard For Certification Of Lifting Appliances No 2.22 October 2008 and subjected to an independent third party approval.

 

Tekmar service engineers perform installation and commissioning onboard the vessel.

 

Technical Specification

  • Safe working load (SWL): 30 Te
  • MPHS dimensions: 6m x 7m
  • Operating depth: 2,000m
  • Guide wires: 4-off 5 Te SWL
  • Guide posts: 4-off API 2586mm adjustable
  • Gross weight: 63 Te (excluding winches)
  • Design temperature: -20 to +50 degC